Phase 00
Enquiry & feasibility
Part data, quantities, material. A first assessment with a guide price, matched to your machine fleet.
Injection moulds from China
Production moulds from one fixed partner plant in DongGuan, with a German GmbH accountable for the result. Your contact is the managing director.
Moulds per year
Machining accuracy
Build cycle
Export, incl. Japan
Figures from A-KITA Precision Molding · as of 07/2026 · HSC milling and mirror EDM, reference moulds measured from design approval
Production moulds SPI 101–103, single- to multi-cavity, sizes up to over 1.2 m. Hot runner, cold runner, 2K, gas-assist.
More on mould making
DFM report, filling simulation, complete 2D/3D design. No steel before your approval.
More on engineering
Status reports with photos, CMM records, sampling T0 to T2, first article inspection report (ISIR) to your standard.
More on quality and project controlProject process
No steel without your approval, no payment without a defined result. That is how a tooling project stays controllable across 8,900 km.
Phase 00
Part data, quantities, material. A first assessment with a guide price, matched to your machine fleet.
Phase 01
The DFM report assesses demoulding, wall thicknesses and gate position while changes still cost nothing.
Phase 02
3D mould design and filling simulation. We order steel only after your written review.
Phase 03
Milling, EDM, assembly, T0 to T2 at the plant. Status reports with photos arrive unprompted.
Phase 04
Full dimensional inspection, ISIR, transport customs-cleared to your factory gate, production release at your plant. Support continues into series production.
Partner plant A-KITA · DongGuan
One plant, no brokering: TG-TP works exclusively with a precision mould maker that has built almost entirely for export since 2010. 5,000 m², around 50 employees, a CMM inspection room, European standard components. You know the plant, the plant knows your standards.
Reference moulds
A selection from the partner plant's automotive projects, with the data that matters. We show further references when we speak.

PA66-GF30 · 2+2 cavities · hot runner · 45 days

ABS · 1+1 cavities · cold runner · 45 days

PP · 1×4 cavities · cold runner · 40 days
“How do you assure quality across 8,900 km?”
Through inspection rather than trust: a CMM room at the plant, dimensional reports with every sampling, status reports with photos from the shop floor. You see every milestone before you approve it.
“Who owns the mould?”
You do. Ownership, handover and marking as customer property are settled in writing in the tooling contract before manufacturing starts.
“What happens if there are defects?”
Your claims go to Römhild: warranty and rework run through TG-TP GmbH under German law. Dealing with the plant is our problem, not yours.
“Why not buy directly in China?”
You can. Then supplier selection, sampling, customs and claims sit with you, in another language and time zone. The direct price is the smallest part of that bill.
Standard components & hot runners
DME and HASCO as the mould base standard, hot runners from Yudo to EWIKON. You source spare parts in Germany, not overseas.
Tool steels
1.2343, 1.2344, 1.2083 and further grades from Assab, Daido, LKM and Gröditz, every batch with a mill certificate.
Inspection & documentation
CMM inspection of electrodes, cavities and inserts. Dimensional records, sampling reports and the ISIR are part of the scope of delivery.
Sales, project management, contracts under German law
Design, manufacturing, sampling, inspection room
Your 5 pm query is answered in your inbox by the next morning: the plant works while Germany sleeps.
A 3D model, quantities and your target date are enough for a first assessment with a guide price. A call works too: you speak directly with the managing director.