Project Management & Quality

Managed from Römhild.

Project management at TG-TP is the product, not an extra: defined responsibilities, fixed reporting points and a quality chain that replaces every claim with a document.

Your contact sits in Germany. Your mould is built in China. A German GmbH is accountable.

Who does what

The division of labour in five seconds, no small print.

 responsible ·  involved

Project stepCustomerTG-TPA-KITA
Part data, requirements specification, target quantity
DFM report and mould concept
Quotation, contract, schedule
Design and filling simulation
Design approval
Manufacturing with status reports
Sampling T0 to T2, corrective loops
Tool acceptance and documentation
Transport, customs, delivery
Production sampling and production release

One contact

You speak with the managing director, in English or German, without a ticket system. Technical points he settles directly with the plant's project engineers.

Reports with photos

Manufacturing progress arrives as a report with photos from the plant: what is milled, you see milled.

Escalation with a path

If something jams, there is a defined path up to plant management, and a German contract partner who is liable.

Coordinate measuring machine in the air-conditioned measuring room

The quality chain at the plant

The zero-defect principle intervenes at four points: faulty designs, components, machining and finished products are each caught at the source.

  • Incoming goods inspection with steel hardness testing per batch
  • CMM inspection of electrodes before EDM
  • CMM inspection of cavities and inserts after machining
  • Inspection of standard parts and sample parts, final check before dispatch

A-KITA, DongGuan · CMM measuring room, air-conditioned

The documentation package

Every project produces the same set of documents. If your QA system requires its own formats, we work with your templates.

Phase 01

DFM report

Mouldability assessment with change proposals, the basis of the quotation.

Phase 02

Design & simulation package

3D design, 2D drawings, filling simulation report, approval record.

Phase 03

Manufacturing & sampling reports

Status reports with photo documentation, steel certificates, T0/T1 reports with dimensional report and moulding parameters.

Phase 04

Acceptance & production package

Acceptance report, first article inspection report (ISIR), mould data sheet, spare parts list, maintenance schedule, final process parameters.

T0
First trial at the plant

Function and dimension check, process window, correction list. Report and samples go to you.

T1–T2
Corrective loops

Targeted corrections directly at the plant; a 4-hour endurance run and video on request.

ISIR
First article inspection report

Full dimensional survey as the basis of your production sampling to VDA Volume 2 or PPAP.

What can go wrong, and what happens then

Mould procurement in China carries real risks. They disappear through mechanisms, not marketing copy.

Staff turnover at the plant

Chinese plants see shorter tenures than German ones. Every project therefore sits documented in the plant's system and at TG-TP: design, electrode data, parameters. Knowledge does not hang on one person.

Try-out depth

Studies name sampling as a weak point of Chinese mould shops. A-KITA runs trials on its own machines, with a dimensional report and parameter set; on request with an endurance run, video and your attendance on site.

Transport damage

Preservation, seaworthy packaging and transport insurance are part of the scope of delivery. The acceptance before dispatch documents the condition.

Changes after start of production

Corrective loops run through the same channel as the project. For urgent cases we coordinate repairs in Germany via the mould's standard component base.

Judge us by the documents.

In conversation we show real reports from live projects: DFM, T1 report, ISIR.